top of page
photo 4.JPG
Report1.jpg
P1050117.JPG
Temporary Works Design​ & Staged installation Reports

For numerous projects that require steel frames to be installed , a temporary works scheme should be provided & sequence of installation in stages prepared to ensure the Builder carries out the works in a safe manner. It will ensure the correct propping arrangement is installed with detailed info on types of props & load capacities.  It is a requirement for Health & Safety reasons & also is requested by Party wall surveyors or Building Control inspectors.

 

For conversion of properties converting ground floor flats, it will be necessary, to submit a temp works package to the Party wall Surveyors. On some projects the Builder has 'eyed' this in & avoided the cost of a temp works package however has resulted in some cracking of the upper storey brickwork. This has proved to be both costly & time consuming repairing brickwork & re-levelling upper floors 

Structural Reports ​

This company has provided numerous reports for Banks & Lenders to confirm if the cracks or other defects are structural, identified as a problem in a Surveyors RIBA (HBR) report or valuation. In these instances a SE Report is normally requested for confirmations whether there is more serious problems with subsidence, settlements or other problems that may be a major expense to the buyer. We have also provided for vendors trying to sell where others have miss-diagnosed the cause of the problem.  Most lenders are interested in the immediate remedial work that may be required, other cosmetic repairs can be at owners discretion.  We identify any potential long term risk & consequences of delaying repair.  We can recommend drain surveys , damp report specialists, timber specialist reports from other companies we have had previous experience with.  We also do numerous minor alteration reports for leaseholders gaining permissions to alter with the Freeholder​

New Basements​ ​

We provide detailed RC Concrete designs for open basements . Drawings & site supervisions or checking of rebar can be arranged with this company.

​Basements can be of many types, from using waterproof concrete or internal drainange schemes. We provide initial guidence to clients that may potentially be considering building a basement & can provide some guidence on costs or feasibility.  

bottom of page